CVA615 Coffee System - Table of Contents
1.0 CONSTRUCTION & DESIGN
1.1 Appliance Overview 1
1.1.1 Front View 1
1.1.2 Controls 1
1.1.3 Interior (Front of Appliance Open) 3
1.2 Technical Data 3
1.3 Layout of Components 5
2.0 INSTALLATION
Installation Procedures 7
3.0 COMMISSION and OPERATION
3.1 General Operation 9
3.1.1 Preparing Coffee 9
3.1.2 Canceling the Preparation 10
3.1.3 Steam Control 10
3.1.4 Hot Water 11
3.1.5 Adjusting the Coffee Grinder 12
3.1.6 Filling the Coffee Bean Container 13
3.1.7 Filling the Water Tank 14
4.0 DESCRIPTION of FUNCTION
4.1 Door Switch 15
4.2 Overflow (reed) Switch 15
4.3 Brew Unit – Cleaning and Care 16
4.4 Removing the Brew Unit from the Appliance 16
4.5 Connection of Brew Unit to Drive Mechanism 17
4.6 Brewing Procedure 17
4.7 Ground Container 20
4.8 Waste Unit Present Switch 20
4.9 Water Tank 22
4.10 Water Level Switch 23
4.11 Grinder Assembly 25
4.12 Grinder Overload Protection 26
4.13 Ground Coffee Dispensing 28
4.14 Dispenser Switch 29
4.15 Brew Unit Drives 30
4.16 Water Pump 32