– Compressor and Tension Pulley
HEATER AND MANUAL
AIR CONDITIONER
55-23
COMPRESSOR AND TENSION PULLEY
REMOVAL AND INSTALLATION
Pre-removal Operation
D Discharging of Refrigerant (Refer to P.55-6.)
Post-installation Operation
D Drive Belt Tension Adjustment
D Charging of Refrigerant (Refer to P.55-6.)
4
2
1
5
3
Piping connection
O-ring
A/C Compressor oil: SUN PAG 56
59 – 69 Nm
Removal steps
AA" 1. Drive belt
2. Idler pulley
AB" 3. Suction hose and discharge hose
connection
AC""AA 4. Compressor
5. Compressor bracket