2205Q2JE-HO-S6-N_2020.01.
Chapter 3 Installation
SCV-series Screw Compressor 3.2 Installation Works
3-3
3.2.4 Preparation for Installation
Installation Space
Secure sufficient working space for easy operation, cleaning, maintenance, and inspection.
Illumination
Prepare illumination devices which allow easy operation, cleaning, maintenance, and inspection.
Ventilation
If natural ventilation is insufficient, install ventilation fans according to the relevant regulations.
Connecting Port of Compressor
Figure 3-1 Connecting Port of Compressor
Table 3-1 Connecting Port of Compressor
No. Item
Connecting port for liquid injection 2
Connecting port for liquid injection 1
Oil supply port for F rotor side bearing
4
Discharge gas outlet (type D)
Discharge gas outlet (type G)
Unloader control (increase)
Lubricating oil main supply port (journal)
MYK 20A MYK 25A MYK 40A
Economizer connecting port
Control wiring connector for indicator
Unloader control (decrease)
Connecting port for oil injection
MYK 25A