B
Site Checklists
Complete the checklists in this appendix to ensure that the site is prepared for
installing and deploying Exalogic machines.
This appendix contains the following topics:
• System Components Checklist
• Data Center Room Checklist
• Data Center Environment Checklist
• Access Route Checklist
• Facility Power Checklist
• Power Checklist
• Safety Checklist
• Logistics Checklist
• Network Specification Checklist
• Reracking Checklists
B.1 System Components Checklist
Complete the following checklist to ensure that the systems component considerations
have been addressed.
System Components Checklist Items
Yes No N/A Comment
Is it an Exalogic machine full rack,
Exalogic machine half rack, Exalogic
machine quarter rack, or Exalogic
machine eighth rack?
How many racks will be installed?
If more than one rack will be installed,
then was the cable upgrade kit ordered?
Is the rack installation a new system or
an addition to an existing system?
Is the system going to connect to
another Exalogic machine?