Installation
80/121 Revision 05 • INSTALLATION AND OPERATING INSTRUCTIONS 8DJH • 500-8067.9
Test operation and
mechanical function test
Always perform test operation and mechanical function test without high voltage.
On circuit-breakers and switch-fuse combinations, do not perform any no-load switching
operations, i.e. opening commands without closing before.
Switch all switching devices several times manually to all switching positions (see page 83,
"Operation") and check the position indicators.
Check mechanical interlocks (see page 14, "Interlocks") with normal force. Verify smooth
operation of control gates.
Check the fuse tripping functionality with a test fuse.
Fit HV HRC fuse-links, see page 109, "Replacing HV HRC fuse-links".
Check service readiness, see page 85, "Ready-for-service indicator". The pointer of the ready-
for-service indicator must be in the green area.
Electrical function test Only circuit-breaker type L2: Insert the retaining bolt at the undervoltage release (option)
in position B.
Switch all three-position disconnectors or three-position switch-disconnectors to OPEN
position.
Switch on auxiliary voltage and check polarity.
Switch switching devices with electrical operation to all switching positions (electrically and
manually). Check position indicators and electrical interlocking conditions.
Only circuit-breaker type L2: While charging the spring energy store and in ready-to-close
state, auxiliary voltage must be applied without interruption at the undervoltage release
(option).
Check electrical indications and trippings.
15.3 Preparing the power-frequency voltage test
A power-frequency voltage test can be performed at the readily installed switchgear.
Preparations Remove voltage transformers.
Remove surge arresters and surge limiters.
Protect bushings of voltage transformers, surge arresters and surge limiters in a surge-proof
way using suitable sealing caps.
Short-circuit the current transformers at the secondary terminals.
Earth the capacitive test sockets.
The power-frequency voltage test can now be performed.
15.4 Instructing the operating personnel
Instruct operating personnel in theory and practice of switchgear operation.
ATTENTION
Circuit-breaker type L2: To operate the circuit-breaker type 2 for test without auxiliary voltage,
the undervoltage release (option) must be blocked. On circuit-breakers type 2, the
undervoltage release is delivered by the factory in "Trip blocked" setting (position A), and will
not function.
Perform test operation with the circuit-breaker type 2.
After test operation, activate the undervoltage release; screw the retaining bolt in at
position B.

Table of Contents

Other manuals for Siemens 8DJH

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens 8DJH and is the answer not in the manual?

Siemens 8DJH Specifications

General IconGeneral
BrandSiemens
Model8DJH
CategorySwitch
LanguageEnglish

Related product manuals