EasyManuals Logo
Home>STEMME>Aircrafts>S12

STEMME S12 User Manual

STEMME S12
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #122 background imageLoading...
Page #122 background image
DOCUMENT NUMBER:
L500-912.820 ISSUE JUL 20, 2016
AMENDMENT: 00
DATE: 
CHAPTERPAGE 520
MAINTENANCE MANUAL STEMME S12
5.4.2 WINGS AND FUEL SYSTEM COMPONENTS IN THE WING CENTER SECTION
Type and Subject of Inspection
Break-in
Aircraft 100 hr
Engine 100 hr
Engine 200 hr
Engine 600 hr
Annual
Refer to
Section
Sign-o
1. Check fuel system components
at spar bridge of wing center
section.
X X X
7.4.6
2. Check vent line outlets at end
ribs of wing center section.
X X X
7.4.6
3. Check function of quick-re-
lease coupling (fuel supply
line).
X X X
7.4.6
4. Clean coarse lters.
X X
7.4.6
5. Check quick drains and lters
in wing center section through
maintenance opening in lower
surface Clean ne lters,
check condition and change if
necessary.
X X
6. Change ne lter.
X
7.4.6.2
7. Check condition, attachment
and function of electrical fuel
pumps through maintenance
opening in lower surface.
X X X
7.4.6.2
8. Check fuel ller cap for leak-
age and for signs of leakage of
wing tanks.
X X X X
7.4.6
9. Check condition and backlash
of wing ttings, check secur-
ing device of wing attachment
bolts.
X X X
7.1.1
10. Check condition of wing aps
and ailerons, check clearance
between components span-
wise 3 ± 0.5 mm / 0.12 ± 0.02 in.
Check gap seals and fairings
on ap/aileron links.
X X
7.1.1
1 1. Check all control rods and sup-
ports in wing center section
and wing attachment area,
check secure fastening of
spring bolt of each quick-con-
nector.
X X X
7.3.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STEMME S12 and is the answer not in the manual?

STEMME S12 Specifications

General IconGeneral
BrandSTEMME
ModelS12
CategoryAircrafts
LanguageEnglish

Related product manuals