EasyManuals Logo
Home>STEMME>Aircrafts>S12

STEMME S12 User Manual

STEMME S12
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #126 background imageLoading...
Page #126 background image
DOCUMENT NUMBER:
L500-912.820 ISSUE JUL 20, 2016
AMENDMENT: 00
DATE: 
CHAPTERPAGE 524
MAINTENANCE MANUAL STEMME S12
5.4.6 TAIL BOOM
Type and Subject of Inspection
Break-in
Aircraft 100 hr
Engine 100 hr
Engine 200 hr
Engine 600 hr
Annual
Refer to
Section
Sign-o
1. Check elevator control lever in
lower vertical n.
X X
7.3.3
2. Check swaged terminals of all
control rods in tail boom.
X X
7.3
3. Check rudder control cables in
forward tail boom.
X X X
7.3.3
4. Check trim system (actuator /
springs).
X
5.4.7 EMPENNAGE
Type and Subject of Inspection
Break-in
Aircraft 100 hr
Engine 100 hr
Engine 200 hr
Engine 600 hr
Annual
Refer to
Section
Sign-o
1. Check rudder ttings.
X X X
7.1.3
2. Check connection of COM
antenna cable (bottom of
rudder).
X X
7.1.3
3. Check adjustment and condi-
tion of rudder control.
X X X
7.3.3
4. Check free movement of rud-
der, especially in case of tail
wheel blockage.
X X X
7.3.1
5. Check front tting of horizon-
tal stabilizer for spring ten-
sion, backlash of bolt, fatigue
cracks and corrosion.
X X X
7.3.1
6. Check rear tting of horizon-
tal stabilizer for wear of pins,
fatigue cracks, axial and radial
backlash and corrosion.
X X X
7.3.1
7. Check tight t of screw con-
nections of both horizontal
stabilizer ttings.
X X X
7.3.1
8. Check connection of elevator
control rod to rear tting of
elevator.
X X X
7.3.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STEMME S12 and is the answer not in the manual?

STEMME S12 Specifications

General IconGeneral
BrandSTEMME
ModelS12
CategoryAircrafts
LanguageEnglish

Related product manuals