EasyManuals Logo

STEMME S12 User Manual

STEMME S12
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #125 background image
DOCUMENT NUMBER:
L500-912.820 ISSUE JUL 20, 2016
AMENDMENT: 00
DATE: 
CHAPTERPAGE 523
MAINTENANCE MANUAL STEMME S12
Type and Subject of Inspection
Break-in
Aircraft 100 hr
Engine 100 hr
Engine 200 hr
Engine 600 hr
Annual
Refer to
Section
Sign-o
12. Check nose-cone operation
(do not grease!).
X X X
7.4.13
13. Check condition, function and
smooth operation of propeller
positioning.
X X X
7.4.13
14. Check condition and smooth
operation of propeller brake
assy. Check propeller brake
band lining
(minimum 1.5 mm / 0.06 in).
X X X
7.4.13
5.4.5 CENTER FUSELAGE EXCEPT FOR FAIRINGS
Type and Subject of Inspection
Break-in
Aircraft 100 hr
Engine 100 hr
Engine 200 hr
Engine 600 hr
Annual
Refer to
Section
Sign-o
1. Check condition of center fu-
selage steel frame.
X X
7.1.2.4
2. Check condition of framework
/ tail boom connection.
X X
7.1.2.4
3. Check condition of upper and
lower connection framework /
front fuselage.
X X
7.1.2.4
4. Check condition of control
assy. in center fuselage.
X X X
7.3.1
5. Check swagged terminals of
all control rods in center fuse-
lage.
X X
7.3
6. Check ap relief gas spring
assy. for proper condition and
tight t.
X X
7.3.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STEMME S12 and is the answer not in the manual?

STEMME S12 Specifications

General IconGeneral
BrandSTEMME
ModelS12
CategoryAircrafts
LanguageEnglish

Related product manuals