75
Before closing the AC circuit breaker between the inverter and the power grid,
use a multimeter that is set to the AC gear to ensure that the AC voltage is with-
in the specified range. Otherwise, the inverter may be damaged.
If the DC side is powered up while the AC side is not, the inverter indicator may
turn red, and the inverter will report a fault named “Grid Power Outage” (the
fault information can be viewed on the iSolarCloud App, see “Records” for de-
tails). The fault is automatically cleared when the AC circuit breaker between
the inverter and the grid is closed.
6.3 App Preparation
step 1 Install the iSolarCloud App with latest version. Refer to "7.2 Installing App".
step 2 Register an account. Refer to "7.3 Account Registration". If you have got the account and
password from the distributor/installer or SUNGROW, skip this step.
step 3 Download the firmware package to the mobile device in advance. Refer to “Firmware Upa-
date”. This is to avoid download failure due to poor on-site network signal.
- - End
6.4 Plant Creation
Prerequisites:
The account and password for logging in to iSolarCloud App have been obtained from
the distributor/installer or SUNGROW.
The communication device is normally connected to the inverter.
System positioning is enabled and iSolarCloud App is allowed to access location
information.
step 1 Open the App, tap
in the upper right corner of the interface, and select the correct ac-
cess address.