EasyManuals Logo
Home>Suzuki>Outboard Motor>DF 90

Suzuki DF 90 Service Manual

Suzuki DF 90
616 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #149 background imageLoading...
Page #149 background image
6-4 POWER UNIT
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.

Do not re-use gasket once removed. Always use a new
gasket.
• Install two dowel pins
1, gasket 2 and intake manifold as-
sembly, then tighten bolts and nuts securely.
" Intake manifold bolt & nut :
23 N
.
m (2.3 kg-m, 16.5 lb.-ft.)
• Install fuel injectors and fuel delivery pipe. (See page 5-13)
• Check to ensure that all removed parts are back in place.
Checking
• Check fuel and water hose routing. (See page 10-8 to 10-11)
• Check wire routing. (See page 10-2 to 10-7)
• Check for fuel leakage. (See page 5-4)
• Check for water leakage.
19. Disconnect water inlet hose
K and water outlet hose L
from 3-way joint.
20. Remove nine (9) bolts and two (2) nuts and then remove
intake manifold assembly
M.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki DF 90 and is the answer not in the manual?

Suzuki DF 90 Specifications

General IconGeneral
BrandSuzuki
ModelDF 90
CategoryOutboard Motor
LanguageEnglish

Related product manuals