EasyManuals Logo
Home>Synesso>Coffee Maker>MVP

Synesso MVP Technical Manual

Synesso MVP
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
29
Located underneath the machine, the electrical box contains all the power and signal wiring running to and
from the Synesso™ machine. Since the 2 boxes represented below have many of the same components, they
have been labeled with numbers for matching components and the descripons follow in the next pages.
3 Group MVP Hydra Electrical Box
ELECTRICAL SYSTEM - Electrical Box
1. Brew Relays: Switch high voltage onto the brew tank heang elements.
2. Each Pump Motor Wire: Carries 220v to the pump motors from the electrical box. Contains 3 wires:
black (L2/N), white (L1) and green (ground). A fourth wire (Red), is used for bypass system control when
appropriate.
3. Grounding Post: For all earth ground connecons.
4. Lid Safety Switch: Cuts power to the control board and other electronics when the lid is removed.
1
2
3
4
5
6 7
15
10
17
16
11 12
14
13
9

Other manuals for Synesso MVP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Synesso MVP and is the answer not in the manual?

Synesso MVP Specifications

General IconGeneral
BrandSynesso
ModelMVP
CategoryCoffee Maker
LanguageEnglish

Related product manuals