EasyManuals Logo
Home>Synesso>Coffee Maker>MVP

Synesso MVP Technical Manual

Synesso MVP
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
56
MAINTENANCE
MAINTENANCE SCHEDULE
Daily
1.Backush each brew group without detergent throughout the day.
2.Backush with an espresso industry approved detergent during the nal cleaning of the night (or aer a
busy period), and then again without detergent to rinse.
3. Wipe down the enre machine with a so cloth.
4.Remove portalters, baskets and springs, drip tray and grates and clean thoroughly. These items are all
dishwasher safe.
5. Slowly pour a pitcher of hot water down the drain to clear grounds debris and prevent blockage.
Weekly
1. Soak portalters and the removed lter baskets in an approved espresso industry detergent and water
soluon overnight. Rinse thoroughly before reassembling and using your portalters.
2. Carefully remove screens from each brew group using a short handled screwdriver and soak overnight in
a similar soluon as the portalters.
3. Rinse screens thoroughly before installing and using. Make sure you install the screens before brewing
any shots of espresso. Failure to do so may plug the drain lines with coee grounds.
Monthly
1. Check your water ltraon system and make sure the cartridges and lters are changed as needed. In ar-
eas of high mineral content, hard water, high parculate count or in very busy locaons, the ltraon sys-
tems will need to be checked more oen.
Quarterly
1. Change portalter gaskets and closely inspect diuser screens and lter baskets, If these items are show-
ing wear, please replace them as soon as possible. Change these items if they show damage or overuse.
2. Briey inspect the machine for leaks or potenal issues. Contact Synesso™or your local distributor or ser-
vice agent to order parts and/or request service.
Synesso™recommends that you contact your distributor or service agent for periodic maintenance. The fre-
quency of maintenance visits will depend on a variety of factors including how much use the machine re-
ceives, but at least one preventave maintenance visit a year is required. During this yearly service, all body
panels must be removed and all connecons both electrical and hydraulic must be inspected. Small prob-
lems can become large if not caught early.

Other manuals for Synesso MVP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Synesso MVP and is the answer not in the manual?

Synesso MVP Specifications

General IconGeneral
BrandSynesso
ModelMVP
CategoryCoffee Maker
LanguageEnglish

Related product manuals