Performance Verification
This section contains a collection of manual procedures for verifying that the
WVR6020, WVR7020, and W VR7120 waveform rasterizer products perform as
warranted. T
he procedures will note to which instruments and options they apply.
The procedures are arranged in two basic sections: Incoming Inspection
Procedures
and Performance Verification Procedures. Thetestsinthischapter
provide an extensive confirmation of performance and functionality when the
following requirement is met.
NOTE. The waveform rasterizer must have b een operating for a warm-up period
of at least 20 minutes, and must be operating at an ambient temperature as listed.
(SeeTable20onpage11.)
Waveform Rasterizers Specifications and Performance Verification 3 7