Mazda 6
Feel the drive
Webasto AG
Postfach 80 - 82132 Stockdorf
Hotline 01805 / 932278 - Hotfax 0395 / 5592-353
http://www.webasto.de
Printed in Germany 04/2008 Printing:
Steffen
1313440A_EN
Final Work
WARNING!
Reassemble the disassembled components in reverse order.
Check all hoses, clamps and all electrical connections for firm seating.
Secure all loose cables using cable ties.
Only use manufacturer-approved coolant.
Spray the heater unit components with anti-corrosion wax (Tectyl 100K, Order No. 111329).
- Connect the battery
- Fill and bleed the coolant circuit according to the vehicle manufacturer’s specifications.
- Set the digital timer.
- Make settings on A/C control panel according to the "Operating Instructions for End Customer".
- Check the proper operation of the additional heater, see the operating instructions/installation
instructions.
- Attach the "Switch off additional heater before refueling" sticker to the left-hand B-pillar.