46 “Operation and installation manual” - “Terra 360 Series 2 - CE”
EN
6.1.3 Remove the base cover - Terra 60
B
B
A
Take the base and remove the 4 screws (A)
Remove the base covers (B)
6.1.4 Open the cable glands - Terra 60
A
B
C
A A B
Open the necessary cable glands for the cables:
AC input cables L1, L2, L3 and Neutral (A). Cable diameter
accepted 27...35 mm.
Protective Earth (PE) cables (C). Cable diameter accepted
19...28 mm.
NOTE
The installation of a second PE cable should
be required by local rules.
Ethernet or signals cables (B). Cable diameter accepted
8...13 mm.
6.1.5 Route the cables - Terra 60
Put the cables L1, L2, L3 and Neutral through the cable
inlets. Apply the full cable slack of 350 mm.
Put the PE cable through the cable guide plate. Apply
the full cable slack of 350 mm.
If there is an ethernet cable, then put it through the cable
guide plate. Apply the full cable slack of 500 mm.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB 2 Series and is the answer not in the manual?

ABB 2 Series Specifications

General IconGeneral
BrandABB
Model2 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals