47 Installation
EN
6.1.6 Install the base - Terra 60
A
D
B
C
C
Put the base (A) on the foundation (B) and use it as a
drilling template
Drill the 6 holes (C) in the foundation
Use the bolts (D) to install the base on the foundation.
Make sure that the cables are fully guided through the
cable glands in the base.
Install the cable glands for each cable
6.1.7 AC cables preparation - Terra 60
NOTE
The length of the cable lug can change, depending on the model of the EVSE. Think about the
length of the cable lug when you calculate where to cut the cables.
A
B
D
C
X
X
X
X
Cut the cables L1, L2, L3 and N (B) to the correct length (X).
(X) = 235 mm is the distance between the cable gland
plate (C) and the center of thet connection terminal (A) on
the main switch (D).
Attach the cable lugs to the cables:
Cable lug dimension - Terra 60
W 25 mm
W
H
H 14 mm
Hole for a M10 bolt Ø10.5 mm
6.1.8 Install the base cover - Terra 60
B
B
A
Install the base covers (B)
Screw the 4 fastners (A)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB 2 Series and is the answer not in the manual?

ABB 2 Series Specifications

General IconGeneral
BrandABB
Model2 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals