58 “Operation and installation manual” - “Terra 360 Series 2 - CE”
EN
NOTE
Operation in IT networks is not allowed.
NOTE
The neutral (N) connection is not present in all EVSE models (dashed line on the below
schematics).
HAZARDOUS VOLTAGE
The EVSE’s protective earth (PE) connection is mandatory.
L1
L1 L2 L3 PE
L3
PE
TN-C-S
L2
L1
L1 L2 L3 PE
L3
PE
TN-S
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
L1
L1 L2 L3 PE
L3
TT
PE
L2
PEN
L1
L1
EVSE
Source Source
Source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Source
EVSE
EVSE EVSE
L2 L3
• Wire L1, L2, L3
• Wire N (if available on the EVSE)
•
Wire PEN to the charger grounding bar with
no interruptions
L1
L1 L2 L3 PE
L3
PE
TN-C-S
L2
L1
L1 L2 L3 PE
L3
PE
TN-S
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
L1
L1 L2 L3 PE
L3
TT
PE
L2
PEN
L1
L1
EVSE
Source Source
Source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Source
EVSE
EVSE EVSE
L2 L3
• Wire L1, L2, L3
• Wire N (if available on the EVSE)
•
Wire PE to the charger grounding bar without
interruption
L1
L1 L2 L3 PE
L3
PE
TN-C-S
L2
L1
L1 L2 L3 PE
L3
PE
TN-S
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
L1
L1 L2 L3 PE
L3
TT
PE
L2
PEN
L1
L1
EVSE
Source Source
Source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Source
EVSE
EVSE EVSE
L2 L3
• Wire L1, L2, L3
• Wire N (if available on the EVSE)
•
Wire PE to the charger grounding bar without
interruption
L1
L1 L2 L3 PE
L3
PE
TN-C-S
L2
L1
L1 L2 L3 PE
L3
PE
TN-S
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
N
L1
L1
Power Cabinet
L2 L3 PE
L3
TT
PE
L2
L1
L1 L2 L3 PE
L3
TT
PE
L2
PEN
L1
L1
EVSE
Source Source
Source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Earthing at
the source
Source
EVSE
EVSE EVSE
L2 L3
• Wire L1, L2, L3
• Wire N (if available on the EVSE)
• Do not wire Main PE to the charger
• Connect Local PE to charger grounding bar
NOTE
Adjustable RCD is mandatory