Site Preparations
2-6 LOGIQ C9 Series – Basic Service Manual
5482298-100 English Rev. 5
Electrical requirements
General requirements
NOTE: GE requires a dedicated power and ground for the proper
operation of its Ultrasound equipment. This dedicated power
shall originate at the last distribution panel before the Ultrasound
system.
Sites with a mains power system with defined Neutral and Live
:
The dedicated line shall consist of one phase, a neutral (not
shared with any other circuit), and a full size ground wire from
the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral
:
The dedicated line shall consist of one phase (two lines), not
shared with any other circuit, and a full size ground wire from the
distribution panel to the Ultrasound outlet.
NOTE: Please note that image artifacts can occur, if at any time within
the facility, the ground from the main facility's incoming power
source to the Ultrasound system is only a conduit.
Electrical requirements for the Ultrasound system
In the table below, the electrical specifications for the Ultrasound
system includes monitor and on board peripherals.
Table 2-3: Electrical Specifications for LOGIQ C9 Series system
Voltage
Tol e r anc e Power Consumption Frequency
220-240 VAC
±10% Max. 950VA 50/ 60HZ