EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ E10

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #124 background imageLoading...
Page #124 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
3 - 34 Section 3-4 - Completing the setup
3-4-12 Complete power down
To complete power down:
1.) Press once on the ON/OFF button on the operator panel to display the SYSTEM - EXIT menu.
2.) Select Shutdown to do a complete power down of the LOGIQ E10.
The back end will first turn off the LOGIQ E10 activity and print the message “Please wait -
Shutdown in progress” in the display on the operator panel.
Next, it starts to shut down. The time to turn down the LOGIQ E10, including the back end, may vary
from 10 seconds up to approximately 1 minute.
The last thing that shuts down, is the light on the operator panel, indicating that you can continue
with the next step.
3.) Switch off the Mains Power Circuit Breaker, located on the rear of the LOGIQ E10. This will cut
power distribution within the LOGIQ E10.
Figure 3-22 ON/OFF button
NOTICE
Risk of losing data. Be sure to wait with the next step until the LOGIQ E10 has finished its shut-down.
Failing to do so may destroy data on the hard disk drive, making the LOGIQ E10 fail later.

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
BrandGE
ModelLOGIQ E10
CategoryMedical Equipment
LanguageEnglish

Related product manuals