EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ E10

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #111 background imageLoading...
Page #111 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 3 LOGIQ E10 Setup 3 - 21
3-4-7 Power On/Boot Up
Warnings
NOTE: Do not cycle the circuit breaker ON-OFF-ON in less than five seconds. When turning OFF the
circuit breaker, WAIT until the ON/OFF button is no longer lit. The LOGIQ E10 should de-
energize completely before turning the circuit breaker ON.
DANGER
ALWAYS CONNECT THE LOGIQ E10 TO A FIXED POWER SOCKET WHICH HAS
THE PROTECTIVE GROUNDING CONNECTOR.
DANGER
NEVER USE A THREE-TO-TWO PRONG ADAPTER; THIS DEFEATS THE
SAFETY GROUND.
DANGER
ENSURE THAT THE POWER CORD AND PLUG ARE INTACT AND THAT THE
POWER PLUG IS THE PROPER HOSPITAL-GRADE TYPE (WHERE REQUIRED).
CAUTION
LOGIQ E10 REQUIRES ALL COVERS.
ONLY OPERATE THE LOGIQ E10 WHEN ALL OF THE BOARD COVERS AND FRAME PANELS
ARE SECURELY IN PLACE. THE COVERS ARE REQUIRED FOR SAFE OPERATION, GOOD
PERFORMANCE AND COOLING PURPOSES.
NOTICE
Use only power supply cords, cables, and plugs provided by or designated by GE.

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
BrandGE
ModelLOGIQ E10
CategoryMedical Equipment
LanguageEnglish

Related product manuals