DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
4 - 4 Section 4-2 - Functional checks
4-2-2 Overview
General System Functional Checks
After setting up the Ultrasound system, performing an upgrade, or replacing hardware, perform all
appropriate functional checks before returning a system to the customer. Include the functional check
information in the service dispatch.
For a Service call with FRU replacement:
• Perform the functional checks and include the debrief script found at the end of the respective
replacement procedure in Chapter 8.
For a Service call with no FRU replacement or when installing the system:
• Perform the following basic functional tests. If all are successful, include the debrief script provided
below.
Some procedures are used more often than others. The intention with this section is to keep the most
used procedures in one place.
NOTE: NOT ALL functional checks will have to be repeated or performed if not all Options are present.
If ONLY a particular Option is present, perform the functional checks for that particular Option
and the Options installed.
Table 4-2 General System Functional Checks
See:
Section Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction 5750007-1EN,
Rev. 1. Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required checks
and is ready for use.
4-2-7 B-Mode Checks
4-2-7 System CFM and PWD Checks
4-2-7 Basic Measurements
10-7-4 Grounding continuity
10-7-5 Chassis leakage current test
4-2-4
Power SHUT DOWN
DO NOT POWER SHUT DOWN until
ALL functional checks have been
performed
In addition: Perform the following Functional
Checks if the Option was or Options were removed
during Backplane replacement.
4D
4-2-7 Probe/Connectors Checks
Perform a 4D sweep
CW
4-2-7
PW/CW Doppler Mode Checks
use pencil probes
4-2-7 Probe/Connectors Checks
10-8-4
Chassis Leakage Current Test
Perform a CW scan with P2D, P6D,
M5S-D probes (plug in and scan)

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
BrandGE
ModelLOGIQ E10
CategoryMedical Equipment
LanguageEnglish

Related product manuals