GE HEALTHCARE
DIRECTION 5394141, REVISION 5 LOGIQ™ P5 SEVICE MANUAL
3-8 Section 3-3 - Receiving and Unpacking the Equipment
Section 3-3 Receiving and Unpacking the Equipment (cont’d)
6.) Remove the MONITOR SUPPORTER and Option Box.
7.) Remove the PLASTIC BAG.
8.) Unlock the front caster and carefully put the console off the PALETTE.
Figure 3-6 Moving the LOGIQ™ P5 from the crate