Section 2 - Installation Procedure
Important! It is essential that personnel responsible for installing,
commissioning and servicing the machine understand the following:
1. The installation and commissioning of the machine should only be carried
out by trained and authorised service engineers.
2. All water and electrical services must be correctly and safely connected.
3. All covers should be replaced correctly and securely and the machine left
in a safe condition.
2.1 Locating the Machine
1. The machine is suitable for indoor use only, sited in an area with a
recommended ambient temperature not below 10º C and not exceeding
30º C. The machine should be located near the appropriate water and
electrical services as detailed in the specification table.
2. Prior to moving the machine to its location, ensure that there is sufficient
access space available via passageways, stairs, lifts, etc and that the
table/counter where the machine is to be located is strong enough to
safely support its weight. (Refer to Specifications Table).
3. To ensure adequate ventilation, 100 - 150 mm (4 - 6 inches) clearance
must be allowed between the back of the cabinet and the wall.
4. Open the cabinet door using the key provided. Remove all transit packing
and the installation kit from the machine. Check for visual signs of damage
which may have occurred during transit. If the machine is damaged or any
parts are missing, you must contact the supplier immediately.
5. Referring to the diagram opposite, fit the four
feet (1) to the machine. Ensure that the spacer
(2) is fitted between the washers (3) as shown.
Using a 12 mm spanner, adjust the feet until the
machine is levelled in both front to back and
side to side planes. Ensure that the door opens
and closes easily.
9
Operators Manual