EasyManuals Logo

Honeywell TC Series User Manual

Honeywell TC Series
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background image
TC · Edition 08.17 23
Function
Test procedure B
Valve V2 opens for the opening time t
L
= 3 s and closes
again. During the measurement time t
M
, the tightness
control checks the pressure p
z
between the valves.
If pressure p
z
> p
u
/2, valve V1 is leaking.
If pressure p
z
< p
u
/2, valve V1 is tight. Valve V1 is
opened for the set opening time t
L
. V1 closes again.
During the measurement time t
M
, the tightness control
checks the pressure p
z
between the valves.
If pressure p
z
< p
u
/2, valve V2 is leaking.
If pressure p
z
> p
u
/2, valve V2 is tight.
The tightness test can only be performed if the pres-
sure downstream of V2 is around atmospheric pressure
and the volume downstream of V2 is at least 5 x higher
than the volume between the valves.
If the power fails briefly during the test or during opera-
tion, the TC will restart in accordance with the test pro-
cedure described above.
If there is a fault message, the fault is displayed again
after a power failure.
t
L
= 3 s
t
M
+
+
+
t
M
p
z
>
p
u
2
V1
V1
V1
p
z
>
p
u
2
V2
OK
V2 V1
OK
V2
V2
t
L
= 3 s
t
L
= 3 s
t
M
+
t
M
p
z
>
p
u
2
+
V2
V2
V2
p
z
>
p
u
2
V1
OK
V1 V2
OK
V1
V1
t
L
= 3 s
p
u
p
z
p
z
>
p
u
2
TEST
V1 V2
Test procedure A Test procedure B
START

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell TC Series and is the answer not in the manual?

Honeywell TC Series Specifications

General IconGeneral
CategoryControl Unit
Enclosure RatingIP20
Input Voltage24 VDC
Communication ProtocolModbus RTU, BACnet MS/TP
SeriesTC Series

Related product manuals