EasyManuals Logo
Home>HP>Switch>5400R zl2 Series

HP 5400R zl2 Series User Manual

HP 5400R zl2 Series
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
2-10
Installing the HP 5400R zl2 Switches
Installation Procedures
Installing the HP 5400R zl2
Switches
Installing a Management Module Battery
The battery on the management module is used to keep time for the internal
switch clock. The internal clock will not function properly without a battery.
WARNING The battery requires special handling at end-of-life. The battery
can explode or cause burns if disassembled, charged, or exposed
to water, fire or high temperature. After replacing the battery,
properly dispose of used battery according to instructions.
There is a risk of explosion if the battery is replaced by an
incorrect type. Ensure to replace the battery with the same type.
To avoid shorting of battery, remove and properly dispose of
battery before returning a Management Module for repair.
Installing a New Battery.
Figure 2-1. Battery location on Management Module
1. Insert the new battery with the lettering and the plus “+” sign facing up.
2. Install the management module into the switch.
ATTENTION ll y a danger d'explosion s'il y a remplacement incorrect de la batterie.
Remplacer uniquement avec une batterie du même type ou d'un type
équivalent recommandé par le constructeur.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP 5400R zl2 Series and is the answer not in the manual?

HP 5400R zl2 Series Specifications

General IconGeneral
BrandHP
Model5400R zl2 Series
CategorySwitch
LanguageEnglish

Related product manuals