5
For heat dissipation and device maintenance, make sure the front and rear of the rack are at least
0.8 m (2.62 ft) away from walls or other devices, and the headroom in the equipment room is no
less than 3 m (9.84 ft).
Installation tools
Installation accessories
Checklist before installation
Table 4 Checklist before installation
Item Re
uirements
Result
Installation site Ventilation
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet vents for heat
dissipation of the router chassis.
A good ventilation system is available at the
installation site.
ESD-preventive wrist strap Hiagonal pliers Blow dryer Drill
Marker
Flathead screwdriver
Phillips screwdriver Needle-nose pliers Wire-stripping pliers Claw hammer