FusionModule5000 Smart Modular Data Center
Maintenance Guide (ECC800)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Tool Name, Specifications, and Appearance
1.3 Technical Documentation Preparations
Before maintenance, prepare the following documents in addition to this document.
Table 1-3 Preparing maintenance documents
Obtaining Method
(Remarks)
Intelligent Micro-Module
Power Distribution System
Wiring Diagram
Describes how to connect
cables to the power
distribution system.
Delivered with the device.
iManager NetEco Device
Commissioning
Guide-(NetEco Version)
Describes how to connect
monitoring hardware to the
NetEco.
The NetEco version depends
on the version in use. Click
on the NetEco WebUI to
obtain the NetEco version.
Click Download.
iManager NetEco Product
Document - (NetEco
Version)
Describes how to install
monitoring hardware and
configure monitoring
software.
UPS5000-E-(40 kVA–128
kVA) User Manual
(Integrated UPS 2.0)
Describes how to operate
and maintain the device.
ECC800 Data Center
Controller User Manual
Describes how to operate
and maintain the device.
ECC800 V100R001 Alarm
Reference
Describes how to operate
and maintain the device.
iBAT 2.0-CIM01C2 User
Manual
Describes how to operate
and maintain the device.
NetCol5000-C 30 kW
Chilled Water In-row
Precision Air Conditioner
User Manual (Simple
Configuration)
Describes how to operate
and maintain the device.