EasyManuals Logo
Home>Huawei>Wireless Router>FusionModule5000

Huawei FusionModule5000 Maintenance Guide

Huawei FusionModule5000
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #163 background imageLoading...
Page #163 background image
FusionModule5000 Smart Modular Data Center
Maintenance Guide (ECC800)
5 Parts Replacement
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
155
Figure 5-50 Removing a CIM (from a battery cabinet)
Figure 5-51 Removing a CIM (from a battery rack)
The preceding text describes how to remove a CIM from the top of the BCB box. The method gives a
reference for removing a CIM from the side panel of the BCB box.
2. Record the DIP switch address of the CIM.
Step 4 Install the new CIM.
1. Clamp the CIM to the fastener.
2. Set the DIP switch for the CIM based on the recorded information.
Step 5 Reconnect cables to the CIM based on the cable labels.
Step 6 After the installation, set up the network. For details, see iBAT 2.0-CIM01C2 User Manual.
----End
5.4.2 Replacing the BIM
Prerequisites
A BIM needs to be replaced.
A spare BIM of the same model is available and functional.

Table of Contents

Other manuals for Huawei FusionModule5000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule5000 and is the answer not in the manual?

Huawei FusionModule5000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule5000
CategoryWireless Router
LanguageEnglish

Related product manuals