EasyManuals Logo
Home>Isuzu>Engine>C-240PW-28

Isuzu C-240PW-28 User Manual

Isuzu C-240PW-28
235 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #127 background imageLoading...
Page #127 background image
ARMY TM 9-2815-254-24
AIR FORCE TO 38G1-94-2
b.
Inspect crankshaft pulley (5) for cracks and wear.
c.
Inspect front gear cover (9) for cracks or other physical damage.
3-25.3. Installation.
a.
b.
c.
d.
e.
f.
g.
Install new crankshaft front oil seal (12, FIGURE 3-50) in front gear cover (9) using oil seal installer
(5-6522-9613-0)
Install two new preformed packings (11) in front gear cover.
Install dial pointer (6).
Insert new preformed packing (10) firmly into groove on front gear cover.
Position front gear cover (9) on engine block and secure with thirteen screws (8). Tighten each bolt to 168
ftlbs (19.9 Nm) in the sequence shown in FIGURE 3-51.
Install two screws (7).
NOTE
Verify engine is at TDC by viewing “ZZ” mark on timing gear visible
through front cover access panel.
Install crankshaft pulley (5, FIGURE 3-50) on crankshaft, aligning mark on pulley with pointer and secure with
bolt (4). Tighten bolt to 137 ft-Ibs (166.0 Nm).
FIGURE 3-51. Front Gear Cover Screw lightening Sequence
3-101

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Isuzu C-240PW-28 and is the answer not in the manual?

Isuzu C-240PW-28 Specifications

General IconGeneral
BrandIsuzu
ModelC-240PW-28
CategoryEngine
LanguageEnglish

Related product manuals