Basic Operations
Copyright © ITECH Electronic Co., Ltd. 45
6. Set “Total Slave Unit” as 5, as shown below:
7. After saving the settings, the user must power off the six electronic loads
and power on again.
Configure the Phase A/A/B/B/C/C of the six electronic loads on master.
1. Press [Menu] to enter the system menu setting interface.
2. Select [PARALLEL SETUP] to enter the parallel setting interface.
3. Press the Up and Down key to select the “Single/Three Phase” > “A+B+C”.
4. Press [EDIT PHASE], configure the Phase A/A/B/B/C/C of the six
electronic loads.
5. Press [Enter] to save the setting.
6. After saving the settings, the user must power off the master and power on
again.
3.20 Three-phase setup
You can set different power or current in three-phase mode. Press [Enter] to
save the parameter of three-phase, then press [Set] to enter into the configure
interface, as shown as below.
ООО "Техэнком" Контрольно-измерительные приборы и оборудование www.tehencom.com

Table of Contents

Other manuals for ITech IT8600 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITech IT8600 Series and is the answer not in the manual?

ITech IT8600 Series Specifications

General IconGeneral
BrandITech
ModelIT8600 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals