EasyManuals Logo
Home>Lenze>Inverter>i950 Series

Lenze i950 Series User Manual

Lenze i950 Series
Go to English
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #173 background imageLoading...
Page #173 background image
Commissioning
The purpose of commissioning is to adapt the inverter as part of a machine with a variable-speed drive
system to its drive task.
Important notes
DANGER!
Incorrect wiring can cause unexpected states during the commissioning phase.
P
ossible consequences: death, severe injuries or damage to property
Ensure the following before switching on the mains voltage:
Wiring must be complete and correct.
Wiring must be free of short circuits and earth faults.
The motor circuit conguraon (star/delta) must be adapted to the inverter output voltage.
The motor must be connected in-phase (direcon of rotaon).
The "emergency o" funcon of the overall system must operate correctly.
DANGER!
Incorrect sengs during c
ommissioning may cause unexpected and dangerous motor and system
movements.
Possible consequences: death, severe injuries or damage to property
Clear hazardous area.
Observe safety instrucons and safety clearances.
Commissioning
Import
ant notes
173

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze i950 Series and is the answer not in the manual?

Lenze i950 Series Specifications

General IconGeneral
BrandLenze
Modeli950 Series
CategoryInverter
LanguageEnglish

Related product manuals