Manitowoc Published 03-29-17, Control # 064-23 v2 4-79
14000 OPERATOR MANUAL SETUP AND INSTALLATION
Install Pile Driver Adapter
If required, attach pile driver adapter. See Pile Driver Adapter
topic on Page 97
.
Install Clamshell Wire Rope Guide
If required for clamshell operation, prepare the lower boom
point as shown in Figure 4-40
.
Connect Boom Butt to Boom
Install boom butt, remove assembly block, connect boom
butt to boom, and connect mast straps to boom straps. See
Crane Assembly instructions on Page 12
.
Make sure you perform following steps. See Crane
Assembly instructions on Page 12
.
1. Lower mast arms.
2. Select proper capacity chart on RCL display,
Configuration screen.
Install Load Line
See Load Line Reeving instructions for proper routing and
reeving of load lines.
Remove bar (16, Figure 4-34
, View G) and lower dead-end
link (15) to working position. Reinstall bar after load line is
installed in lower boom point.
FIGURE 4-37
3
4
2
2
View A
Stored Position
View B
Working Position
1
Lift
Item Description
1 Wire Rope Guide
2 Pin with Snap Pins
3 Pin with Snap Pins
4Strut
1
14COM4163