EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove YB5520

Manitowoc Grove YB5520 User Manual

Manitowoc Grove YB5520
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #109 background imageLoading...
Page #109 background image
Grove Published 07-06-2017, Control # 406-03 5-15
CD5520/YB5520 OPERATOR MANUAL ATTACHMENTS
5
7. Install the hoist block using instructions in Installing the
Hook Block, page 5-5. Install the load pin.
8. Connect the transmitter wire (Figure 5-35) and the load
pin wire to the jumper wire.
9.
INSTALLING CABLE ON THE HOIST
NOTE: The cable should preferably be straightened before
installation on the hoist drum.
Install cable on the hoist drum in accordance with the
following procedure.
1. Position the cable over the boom nose sheave and route
to the hoist drum.
2. Position the hoist drum with the cable anchor slot on top.
3. Insert the cable through the slot and position around the
anchor wedge (1) Figure 5-37.
NOTE: The end of the cable should be even with the
bottom of the slot for the anchor wedge.
4. Position the anchor wedge in the drum slot; pull firmly on
the free end (2) of the cable to secure the wedge.
NOTE: If the wedge does not seat securely in the slot,
carefully tap (3) the top of the wedge with a mallet.
5. Slowly rotate the drum, ensuring the first layer of cable is
evenly wound onto the drum.
6. Install the remainder of the cable, as applicable.
CAUTION
If cable is wound from the storage drum, the reel should
be rotated in the same direction as the hoist.
FIGURE 5-37
1
2
2
3
7312
7196
Reference Only

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove YB5520 and is the answer not in the manual?

Manitowoc Grove YB5520 Specifications

General IconGeneral
BrandManitowoc
ModelGrove YB5520
CategoryConstruction Equipment
LanguageEnglish

Related product manuals