EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove YB5520

Manitowoc Grove YB5520 User Manual

Manitowoc Grove YB5520
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #115 background imageLoading...
Page #115 background image
Grove Published 07-06-2017, Control # 406-03 6-3
CD5520/YB5520 OPERATOR MANUAL MAINTENANCE
6
Anti-Double-Blocking System
Check that the system is working properly.
Controls
Check that all controls are working properly.
After First 50 Hours Of Operation (New
Cranes)
Engine
Change the engine oil and filter.
Transmission
Change the transmission oil filter.
Swing Gearbox
Check and tighten mounting bolts.
Hoist Gearbox
Check and tighten mounting bolts.
Swing Gear Pinion and Swing Gear
Lubricate.
Grease Fittings
Apply grease to all grease fittings.
Boom Cables
Inspect cables for looseness and tighten.
Boom Slides
Lubricate.
Wheel Mounting Nuts
Check Torque.
Cranes Not In Regular Use
A crane which has been idle for a period of one month or
more, but less than six months, must be given an inspection
by a qualified person. This person should use the daily
through monthly inspections.
A crane which has been idle for a period of over 6 months
must be given a complete inspection covering all inspections
through one year, by a qualified person.
Standby cranes must be inspected using the daily through
monthly inspection, by a qualified person.
PREVENTIVE MAINTENANCE
Maintenance Schedule and Checklist
NOTE: Hour intervals in each maintenance chart show the
correct time for service. The hourmeter located in
the operator’s cab indicates the total hours the
crane has been running.
In addition to the following scheduled maintenance,
perform the scheduled maintenance suggested in
the engine manual furnished with the crane.
When performing maintenance, do the required
maintenance interval as well as all previous interval
maintenance. For example, when performing the
250 hour (monthly) maintenance interval, perform
all the tasks required for daily, 50 hour and 100
hour maintenance.
Reference Only

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove YB5520 and is the answer not in the manual?

Manitowoc Grove YB5520 Specifications

General IconGeneral
BrandManitowoc
ModelGrove YB5520
CategoryConstruction Equipment
LanguageEnglish

Related product manuals