Labscale Tangential Flow Filtration System User Guide 19
Install Stir Bar
If mixing is required, open reservoir cover and drop stir bar to the
bottom of the reservoir.
Figure 15: Install Millex vent.
Labscale Stir Base Set Up
Power Connection
1. Turn stirrer and pump (if equipped) speed controls to the off
position.
2. Connect power cord to power cord receptacle located at the
rear of the system base.
3. Align detent on connector with receptacle.
4. Press connector into receptacle and turn lock ring to secure.
5. Inspect transformer label, checking for proper voltage. The
wall transformer serves as a means of cutting the power to the
system.
Note: The system should not be located in a place that may
allow liquid to be splashed under the enclosure.