EasyManuals Logo
Home>Omron>Touch terminals>NS5-SQ00 V2 Series

Omron NS5-SQ00 V2 Series User Manual

Omron NS5-SQ00 V2 Series
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #251 background imageLoading...
Page #251 background image
Appendix 5 Preparing Connecting Cables
A-5-2 Soldering
1. Pass a heat-shrinking tube over each wire.
2. Pre-solder each wire and connector terminal.
3. Solder each of the wires to the connector terminals.
Heat-shrinking tube
Internal diameter: 1.5
Length = 10
Soldering iron
4. Replace the heat-shrinking tube up to the soldered section, and shrink the tube onto
the wire by applying heat using a soldering gun.
Heat-shrinking tube
A-5-3 Hood Assembly
Assemble the hood as shown in the following diagram.
Aluminum foil tape
End with Connector End without Connector
A-32

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron NS5-SQ00 V2 Series and is the answer not in the manual?

Omron NS5-SQ00 V2 Series Specifications

General IconGeneral
BrandOmron
ModelNS5-SQ00 V2 Series
CategoryTouch terminals
LanguageEnglish

Related product manuals