EasyManuals Logo
Home>Omron>Touch terminals>NS5-SQ00 V2 Series

Omron NS5-SQ00 V2 Series User Manual

Omron NS5-SQ00 V2 Series
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #85 background imageLoading...
Page #85 background image
3-8 Installing the Controller Link Interface Unit
3-8-3 Installation Method for Controller Link Interface Unit
This section explains the method for mounting a Controller Link Interface Unit to the PT.
The Controller Link Interface Unit can be mounted to NS12 and NS10 PTs only. It cannot be
mounted to an NS8 or NS5 PT.
Note Do not touch the surface of the substrate or mounted devices with your bare hands. Also,
discharge static electricity from your body in advance.
After mounting the Controller Link Interface Unit to the PT, all fittings must be tightened
with the provided screws. Tighten the screws to a torque of 0.6 Nm.
Always turn OFF the power to PT before mounting or removing the Unit. Follow the proce-
dures and install the Unit correctly.
When the Controller Link Interface Unit is installed, the depth of the PT will increase by
35 mm.
To install the Controller Link Interface Unit, secure sufficient space inside the control panel
beforehand.
3-43

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron NS5-SQ00 V2 Series and is the answer not in the manual?

Omron NS5-SQ00 V2 Series Specifications

General IconGeneral
BrandOmron
ModelNS5-SQ00 V2 Series
CategoryTouch terminals
LanguageEnglish

Related product manuals