52
PROGRAMMING
This is the temperature display screen.
Line 2 indicates the temperature scale that you are currently in (Fahrenheit or Celsius).
Line 4 indicates the operaon status of the machine’s brew valves.
Seng the brew valve funcon to [ON] will acvate the brew valves, allowing the pressure to be bled from
the brew tanks. Once the pressure has dropped, turn the brew valve seng back to [NORMAL] and aach
the appropriate drain hose to the brew group’s drain tube. Turn the brew valve seng back [ON] once the
drain hoses are securely aached. This will allow the water in the brew groups to fully drain in approximately
5 minutes. When the brew groups are nished draining, set the brew valve indicator back to the [NORMAL]
seng. If the draining process takes longer than 5 minutes, the machine’s safety programming will automa-
cally turn the brew valve indicator to the [NORMAL] seng while exing back to the temperature overview
screen. If more me is needed, return to the Temperature Display screen and set the brew valve funcon
back to [ON] to nish the procedure. Once nished with the draining procedure, make sure the brew valve
funcon is set back to [NORMAL]. To cycle to the next display screen, press the down buon.
Menu Level 2: Temperature
Menu Level 2: Line Pressure Boost
If the machine has an oponal line pressure boost pump installed, you will see this menu screen, otherwise it
will not be shown.
Please connue to the next page for more details.