Dehydrate Pre-Heat
Dehydrate Mode
Sequence Of Events:
1) K4, K10, K11 relays close.
2) K4
relay energizes both cooling motors; airflow from cooling motor
closes the “air switch” contacts, the completed “air switch” circuit signals
the board {signal voltage).
Note: if the air switch circuit is not completed within 40 seconds, the board
will interpret a cooling fan fault and display an F34 error code for the
upper oven, and an F64 error code for the lower oven.
3) Pin header P14 on the relay board sends 24 VDC To the double line break
relay (DLB) coil. When the coil is energized; the DLB contacts close.
Current flows from L1 to one leg of the bake, broil and convection
elements.
4) Convection relay K10 closes and sends current from L2 to the other leg of
the convection element, the convection element is on for 30 seconds
during each 1-minute cycle.
Page 69

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Thermador C302 and is the answer not in the manual?

Thermador C302 Specifications

General IconGeneral
BrandThermador
ModelC302
CategoryOven
LanguageEnglish

Related product manuals