Sound power levels
Discharge
Measurement conditions:
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
long) fixed to its discharge opening.
Fan Power level in dB(A), per Hz frequency band Overall power
Unit speed 125 250 500 1000 2000 4000 8000 dB(A)
1 55 50 42 37 37 31 30 46
FWD 08 2 57 54 47 40 30 38 40 50
3 58 57 50 42 32 40 43 53
1 57 51 45 42 34 33 28 48
FWD 10 2 58 54 48 45 38 39 35 51
3 60 58 50 48 40 42 39 54
1 57 51 45 42 34 33 28 48
FWD 12 2 58 54 48 45 38 39 35 51
3 60 58 50 48 40 42 39 54
1 56 62 50 48 39 38 36 56
FWD 14 2 61 66 55 53 47 46 45 60
3 63 69 58 56 50 50 49 63
1 57 63 51 49 40 39 37 57
FWD 20 2 61 66 55 53 47 46 45 60
3 63 69 58 56 50 50 49 63
Intake
Measurement conditions:
Measurements taken at the horizontal air intake.
Fan Power level in dB(A), per Hz frequency band Overall power
Unit speed 125 250 500 1000 2000 4000 8000 dB(A)
1 56 55 55 53 46 45 42 57
FWD 08 2 63 62 60 60 53 53 53 64
3 66 65 63 62 56 55 57 67
1 62 58 55 58 51 48 44 61
FWD 10 2 66 63 60 62 56 55 52 66
3 70 67 63 65 59 59 57 69
1 62 58 55 58 51 48 44 61
FWD 12 2 66 63 60 62 56 55 52 66
3 70 67 63 65 59 59 57 69
1 66 65 65 65 57 50 46 68
FWD 14 2 73 72 69 71 64 59 57 74
3 78 76 73 75 69 64 63 78
1 68 72 64 64 56 52 50 69
FWD 20 2 76 76 68 71 65 61 61 75
3 78 79 71 74 69 66 66 78
Maintenance routine
Commissioning
- Check installation of equipment/pre-commission.
- Congure unit control module.
- Calibrate controls.
- Check operational set points and performance.
- Check operation of all safety devices.
- Megger the motor compressor windings.
- Check unit operation.
- Record operating temperatures pressures, amperages
and voltage.
- Carry out leak test.
- Fill the start up log sheet and review with the
operator.
Gas Heat
- Check operation of gas train components.
- Check burner sequence of operation.
- Check combustion blower assembly.
- Check gas pressure to unit.
- Inspect ame condition.
- Carry out ue gas analysis
Electric Heat
- Inspect all electrical connections.
- Verify correct operation of heating elements.
Hot Water/Steam
- Inspect valves and traps.
- Verify operation of heating
500/1000 hours visit
- Visit at the end of running in period.
- Replace compressor oil on all circuit’s.
- Replace liquid line drier cores on each circuit (if
applicable).
- Carry out leak test.
- Inspect contacts and tighten terminals.
- Record operating pressures, amperages and voltage.
- Check condition of evaporator & condenser coils.
- Check operation of machines/compare conditions of
operation against original commissioning data.
- Fill out the 500/1000 hours visit log sheet and review
with the operator.
- Carry out ue gas analysis ( Gas Heating ).
- Log book to be stamped validating 500/1000hr. visit
Inspection visit
- Carry out leak test.
- Inspect contacts and tighten terminals.
- Record operating pressures, amperages and voltage.
- Check condition of evaporator & condenser coils.
- Check operation of machines/compare conditions of
operation against original commissioning data.
- Carry out ue gas analysis ( Gas Heating ).
- Complete log sheet and review with the operator.
Annual Maintenance
- Check operational set points and performance.
- Calibrate controls.
- Check operation of all safety devices.
- Inspect contacts & tighten terminals.
- Megger the motor compressor windings.
- Record operating pressures, amperages and voltage.
- Carry out leak test.
- Check conguration of unit control module.
- Replace line drier cores on each circuit (if applicable).
- Carry out system analysis.
- Change the oil as required based upon results of the
Trane laboratory analysis.
- Lubricate motors/dampers/bearings (where
applicable).
- Check condition of evaporator & condenser coils.
- Check operation of machines/compare conditions of
operation against original commissioning data.
- Complete annual maintenance visit log sheet and
review with the operator.
Gas Heat
- Check operation of gas train components.
- Check burner sequence of operation.
- Check combustion blower assembly clean if required.
- Check gas pressure to unit.
- Inspect ame condition.
- Carry out ue gas analysis.
Electric Heat
- Inspect all electrical connections.
- Verify correct operation of heating elements
Hot Water/Steam
- Inspect valves and traps.
- Verify operation of heating.
- Inspect coil.
Refrigerant leak detector R454B
- Calibration has to be carried out every year.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Airfinity XL IH190 and is the answer not in the manual?

Trane Airfinity XL IH190 Specifications

General IconGeneral
BrandTrane
ModelAirfinity XL IH190
CategoryChiller
LanguageEnglish

Related product manuals