HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 16 of 128
2.1.3. Power Cabinet
Outside view of the Power Cabinet
A Base cover D 3G Antenna
B Air outlet E Air inlets (also on the left and back side)
C Door F Door handle / lock
Inside view of the Power Cabinet
A Main switch D Data/communication connection
B AC Power connection E Display (only present in HVC 150)
C Guidance plate of the cables