HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 37 of 128
4.2.2. Workflow with pre-fabricated concrete foundation
1. Make a hole in the ground with at least a minimum depth of 34.84 Inch, shown in the figure
above.
2. Fill the hole with (minimum) 7.87 Inch lean concrete (C), see figure above.
3. Make sure that the conduits are routed to one of the indicated positions (B). The conduits
must come out of the foundation with a length of about 9.84 Inch.
4. Make sure that the AC power cable is routed to one of the indicated positions (B).
5. Lower the foundation (A) into the hole.
6. Make sure that the front top surface of the foundation is at least 0.59 Inch above ground
level (see figure above).
7. Make sure that the top surface of the foundation is leveled.
8. Route the conduits through one of the eight holes (B).
9. The conduits must be installed with a curve inside the foundation in order to prevent water
from entering the conduits, and seal the space between the conduits and all open holes.
10. Route the AC power cable through one of the eight holes (B). Make sure that a cable
length of 39.37 Inch is available above the surface of the foundation for internal routing in
the cabinet.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HVC and is the answer not in the manual?

ABB HVC Specifications

General IconGeneral
BrandABB
ModelHVC
CategoryBattery Charger
LanguageEnglish

Related product manuals