HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 92 of 128
5.16.1. Gland layout of the ACS Control Module
DC+ In (from HVC 150, master)
DC+ In (from HVC 150S, slave 1)
DC+ In (from HVC 150S, slave 2)
5.16.2. Open the door of the ACS Control Module
Preconditions:
Key