Section-10
04-3004_S10_TDS_ABB_POWERSCALE_10-50 kVA_EN_150113.doc Page 18/20 ABB
Printed in Switzerland – Modifications reserved
10.11.1 HEAT DISSIPATION PER UPS RANGE WITH NON-LINEAR LOAD
Heat Dissipation with 100% Non-linear
Load per range (EN 62040-3)
Heat Dissipation with 100% Non-linear
Load per range (EN 62040-3)
Airflow (25° - 30°C) with 100% Non-
linear Load per range
(EN 62040-3)
Heat Dissipation without load
10.12 BLOCK DIAGRAMS
10.12.1 WIRING AND BLOCK DIAGRAMS
The customer has to supply the wiring to connect the UPS to the local power source. The installation inspection
and initial start up of the UPS and extra battery cabinet must be carried out by a qualified service personnel such
as a licensed service engineer from the manufacturer or from an agent certified by the manufacturer
10.12.2 RECOMMENDED CABLE SECTIONS & FUSE RATINGS
Cabinet A (10-15-20 kVA) & Cabinet B (10-15-20-25 kVA) terminal connections overview
Battery
(+ / N / - ) + PE
[quantity x mm
2
]
Input Rectifier
1L1, 1L2, 1L3 + N + PE
[quantity x mm
2
]
Input Bypass
2L1, 2L2, 2L3 + N + PE
[quantity x mm
2
]
Output load
3L1, 3L2, 3L3 + N + PE
[quantity x mm
2
]