8-2 Mounting Options
5150 Service Aggregation Switch Hardware Installation and Start-up Manual
009-3222-001 Standard Revision H
Copyright
©
2012-2015 Ciena
®
Corporation July 2015
The 5150 chassis is 2 rack units in height. The bracket will be installed on the
sides of the chassis near the front, and towards the bottom of the unit. When
installed, the bottom of the unit will be positioned against the mounting
surface.
For a procedure see “Installing the Wallmount Bracket” on page 8-5.
19” Frame Mount Bracket - 2 RU
Orderable Part Number: 170-0602-901 (19” 2RU Mounting Bracket Kit)
The frame mount bracket is attached to the sides of an unpowered/
unconnected chassis and used to position the unit in a 19" frame. This bracket
kit also includes cable supports. The cable supports are installed on the
mounting brackets and are used to keep the cables out of adjacent equipment
space by directing them along the faceplate of the unit.
The mounting bracket kit includes:
• two brackets (the same bracket is used for both the left and right sides),
• four cable supports,
• four 8-32 x 1/2 length pan head screws (used to attach the cable supports
to the brackets), and
• eight 8-32 x 5/16 length pan head screws (used to attach the brackets to
the side of the chassis).
WARNING: Vent holes must be positioned at the top when the chassis is wall
mounted. In some cases where a particular direction (left or right) is required for
cable routing and faceplate access, the bracket may need to be mounted with the
flange at the top of the unit resulting in the unpainted underside of the unit facing
outward when installed.