Chapter 3
Copyright © 2019 Eaton Corporation. All Rights Reserved.
IPN March 2019
55
Cha pte r 3
Installation
Overview
Topic Page
Installation Tasks 56
Task 1 - Check the AC Supply and Grounding 68
Task 2 - Move Mounting Brackets (if required) 68
Task 3 - Mount the RM3-340/440 in the Rack 68
Task 4 - Connect Mid-point Monitoring (if required) 68
Task 5 - Connect the Output Cables 68
Task 6 - Connect to the AC Supply Point 68
Installation Completed 68