EasyManuals Logo
Home>Eaton>Controller>EFX48 e-Fuse Series

Eaton EFX48 e-Fuse Series User Manual

Eaton EFX48 e-Fuse Series
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
EFX48 e-Fuse Operation
Copyright © 2019 Eaton Corporation. All Rights Reserved.
IPN March 2019
77
Starting the EFX48
When dc power is applied to the EFX48 (via the rear power connector) the start-up sequence
begins.
Any loads that are configured to connect will do so in a staggered sequence. Once connected
each load output’s LED will be illuminated solid green. If there is any reason why the loads
cannot connect (for example the internal temperature is too high or the bus voltage too low)
then the loads will be pending and their LEDs will flash at 1Hz.
Any strings that are configured to connect will do so in a staggered sequence. Once connected
each string’s LED will be illuminated solid green. If there is any reason why the strings cannot
connect (for example the string voltage is too low) then the strings will be pending and their
LEDs will flash at 1Hz whilst the system tries to establish correct conditions for connecting the
strings.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton EFX48 e-Fuse Series and is the answer not in the manual?

Eaton EFX48 e-Fuse Series Specifications

General IconGeneral
BrandEaton
ModelEFX48 e-Fuse Series
CategoryController
LanguageEnglish

Related product manuals