ControlWave Instruction Manual (CI-ControlWave)
takes over. Once the core updump completes, set the failed unit’s CPU
switch SW1-1 to ON and SW1-4 to ON, if required, and then power
cycle the failed unit to receive the sideload to become a valid standby
unit. This applies to the ControlWave REDIO as well.
5-34 Service & Troubleshooting Revised Nov-2010