P50 Agile P153
13 Commissioning Instructions
P153/EN M/B
13-3
1 CHAPTER OVERVIEW
This chapter consists of the following sections:
1
Chapter Overview
2 Commissioning
2.1 Commissioning Test Menu
2.1.1 Test Mode
2.1.2 Test Pattern
2.1.3 Contact Test
2.1.4 Test LEDs
2.1.5 Opto Input status check
2.1.6 Opto Output status check
2.1.7 Commissioning Test equipment required
2.1.8 Battery check
2.1.9 External circuitry check
2.1.9.1 Earthing
2.1.9.2 CT Polarity
2.1.10 Check relay settings
2.1.11 Protection Timing checks
2.1.11.1 Overcurrent check
2.1.11.2 Connecting the Test circuit
2.1.11.3 Performing the Test
2.1.11.4 Checking the Operating time
2.1.12 Onload checks
2.1.12.1 Onload checks
2.1.13 Final check

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Agile P153 and is the answer not in the manual?

GE Agile P153 Specifications

General IconGeneral
BrandGE
ModelAgile P153
CategoryRelays
LanguageEnglish

Related product manuals