DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 3
8-2-2 Warnings
Table 8-1 Preparations and Preparation Links
Preparations - you must perform the following steps
WARNIN
G
WARNIN
G
Energy Control and Power Lockout for LOGIQ E10:
When servicing parts of the Ultrasound System where there is exposure to voltage greater than 30
Volts:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AND THE ON/OFF
BUTTON (WHITE LIGHT ON THE OP PANEL) TO TURN OFF, AS THERE ARE NO TEST POINTS
TO VERIFY ISOLATION.
5. REMOVE THE BATTERY COVER AND DISCONNECT THE POWER CABLES J10 and J11 (black
and red) FROM THE BACKPLANE. See: 8-2-2 "Warnings" on page 8-3 and 8-11-15 "Rear I/O
replacement" on page 8-327.
Beware that the Main Power Supply, the Batteries, Power Module, ECB Shear Wave Capacitor Pack
may be energized, even if the power is turned OFF if the cord is still plugged into the AC Outlet.
Signed
Date
TAG
&
LOCKOUT
J10
J11
J10
J11
Sig n e d
Date
TAG
&
LOCKOUT
J10
J11
J10
J11
Signed Date
TAG
&
LOCKOUT
J14
J13

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
BrandGE
ModelLOGIQ E10
CategoryMedical Equipment
LanguageEnglish

Related product manuals